COMPLETING MY FINAL YEAR PROJECT


            Salam to viewers, today is my final to update my blog because my final year project iss already complete. Firstly, I want to say thank you to my supervisor Sir Shamsul Adlan and co-supervisor Prof Dr Zulkifli that teach and guide me to complete my FYP project. Therefore, also thanks you for those who are stay and visiting my blog from the FYP 1 until FYP2......I hope you guys can get knowledge from what I have share in this blog....Below I also attach  a picture with co-supervisor Prof Dr. Zulkifli and short video to you guys and hope you guys can enjoy this video...☺☺☺






VIDEO 






Friday, 4 May 2018

Week 14 (FYP 2)


INDUSTRY DAY 

      Salam viewers.....today is Wednesday on 2nd May where the Industry Day were take place. The final week for this project, as I remind you all in this previous weeks. My tittle for this project is The development of Gas Leakage Detector for Home Appliance. 

      However, 2 lecturer will be assessor to assess every student in this Industry day. The assessor for this FYP 2 is 1 person from lecturer BMI and another one is industry day people. Throughout the presentation, the presentation should be around 15 to 20 minutes. Below I also attach some picture before the presentation start.  








That's all for today.....Thank you for visiting my blog........☺☺☺☺ 






Saturday, 28 April 2018

Week 13 (FYP 2)


PREPARATION ON THE INDUSTRY DAY


        Hi viewers, I'm back today .... here I want to share with you all about preparation for the industrial day next week ... This week I have finished making my posters to present  next week and I also meet my supervisor for him check if my poster is right or nothing to add before I print the full poster. He told me to make some additions to the marketing posters while the technical posters did not get any errors. Below, I also attach the poster for technical and marketing poster for presentation next weeks. 


     



VIDEO 





That's all for today, later I will upload for the presentation day next weeks.....Thank you for visiting my blog.....☺☺



Friday, 20 April 2018

Week 12 (FYP 2)


PROJECT PROGRESS (CONT...)

Assalamualaikum and hai viewers, today I want to continue with my progress report which is to produce a grafana result. I have met my co-supervisors, and he guides me how to use the grafana. He also showed me how to generate my project where in the event of a user's alert will continue to be aware of gas leakage. However, I did and continued with what he told me to get a full graph for my project. I have gotten it for this project but it does not fit as much as I want. I have also made many tests of persistence but the graphs have not been fully resolved. The result of grafana are given only half. Here I also include the result of the grafana that I get. 






In this graph, as we can see at the 40th and above, there is a red mark in which gas leakage, consumers will continue to find that the house they live now has a gas leak and then the user will receive sms or email when there is a gas leak. So, they do not have to go down or go to the kitchen to quench the fire in case of gas leakage.




That's all for today. I hope you guys can wait until I upload the full of my  whole project later. Thank you for reading my blog.     ^^,

Saturday, 14 April 2018

Week 11 (FYP 2)


FINAL FYP 2 BRIEFING 


Salam viewers...this week is the final briefing of FYP 2 students. The briefing was conducted in TTL  2 and as usual always happened on the evening. All students FYP 2 were compulsory in attendance. The speaker for this last briefing is Madam Tengku Azita. 


Date: 11 /4/2018
Time: 3pm - 5pm
Venue: TTL 2


In this briefing, the FYP committee have been briefing to us about:


PRESENTATION DAY, INDUSTRY DAY & FYP ASSESSMENT FORM, FINAL REPORT SUBMISSION AND FYP CLAIM. 



PRESENTATION DAY
  • save the date!!! (2/5/2018) Wednesday
  • Present at Gemilang Hall at 1pm until 5.30pm
  • Present with in (15 to 20 minute)
  • Poster size in A1 and the design of poster are free design and front.



INDUSTRY DAY & FYP ASSESSMENT FORM
  • It will be a surprise for FYP 2 students which is the assessor might be 2 or 3.
  •  FYP assessment form is given by the committee FYP.       



FINAL REPORT SUBBIMTTION
  • the students can check the submittion of the final report in the FYP website.



FYP CLAIM
  • Give only 1 receipt on different A4 paper.
  • Scan the receipts to avoid damaged.
  • 1 student of the FYP claim can get RM500. 



Thats all for today, till we meet again in my next update blog ☺.........Thank you and have a nice day today......





Sunday, 25 March 2018

Week 9 (FYP 2)



3rd BRIEFING FYP 2 (ABSTRACT WRITING, POSTER PREPARATION AND PRESENTATION SKILL) 


Salam and hai viewers, this week is 3rd briefing for FYP 2 students. The briefing was conducted in TTL 1 and as usual always happen on the evening. Like everyone knows, the attendance for all FYP 2 students is compulsory.  The speaker for this workshop is Ms. Najihah Saleh. 


                                                 Date : 21/3/2018
                                                 Venue : TTL 1
                                                 Time : 3.00pm - 5.00pm


 In this briefing the FYP committees have been briefing to us about:

HOW TO WRITE ABSTRACT IN THESIS WRITING, PREPARATION FOR POSTER AND SKILLS FOR PRESENTATION. 



ABSTRACT WRITING
  • One (1) page
  • One (1) paragraph
  • No point from the sentences 
  • The sentences must be written in statement form
  • Summary review of;
    • objectives
    • scope and limitation
    • methodology
    • results




POSTER PRESENTATION
  • Must be in PPT format and for advance is using the adobe software
  • The sample can be seen at the fyp website..





                                                          Layout of the poster



PRESENTATION SKILLS
  • Don't panic if make a mistake in presenting (acknowledge it, laugh and move on)
  • Don't read (understands & paraphrases-it keeps people on their toes)
  • Practice! Practice!!! (practice make perfect)
  •  Summarize & keep it short!! (say everything that needs to be said in as few words as possible)
  • Use a mirror!! (increasing the charismatics skills)
  • The eyes have it!! (maintain good eye contact with the assessor and smile ☺☺☺)



Thats all for today, I hope you all get some knowledge for what I have share for this week. Thank you and have a nice day..... 








Sunday, 18 March 2018

Week 8 (FYP 2)


PROJECT PROGRESS

               In this weeks, I still continue working with coding. I have already install software arduino but the arduino cannot function fully. So I have contact my co-supervisor and he said to meet him if the software arduino that I have install still cannot open or not. I have already meet him and he said to install again software arduino and finally I can install the software arduino with the guide from the co-supervisor. So, I can proceed coding to my progress FYP 2 . 

                 However,  I also write the coding that connect with the sensor. Below is the coding for my FYP 2  progress. 








Later I will update my progress FYP2 project. I hope you guys gets some knowledge from what I have been share. Thank you ^ _^







Sunday, 11 March 2018

Week 7 (FYP 2)

CONSTRUCT CIRCUIT DIAGRAM (cont..)


        In this week, I still working on the hardware to construct the final circuit on the breadboard. After I finish my construct on breadboard I can proceed with the coding to make my progress run as shown in my ghan chart at FYP 1. 




This is my final circuit that have been construct on breadboard. 



 That's all for this week, later I will update for more progress. Thank you. 

Saturday, 3 March 2018

Week 6 (FYP 2)


CONSTRUCT CIRCUIT DIAGRAM

This week I have been construct a circuit diagram of my FYP 2 project which is "The Development of Gas Leakage Detector using buzzer for Home Appliance". Below this, I attach some part of the circuit diagram and for more detail, I will explain in the video. 





Connection circuit diagram with sensor and buzzer




2nd BRIEFING FYP 2 (RESULTS & DISCUSSION, CONCLUSION)


In this week, the briefing was conducted in TTL 1 and as usual, the attendance for all FYP 2 students is compulsory. The speaker for this week is Dr. Fadi M. Albatsh. 



  DATE : 28/2/2018
VENUE : TTL 1
TIME : 3pm-5pm


In this briefing, the FYP committees have been brief us about:

HOW TO WRITE CHAPTER $ AND CHAPTER % IN THESIS WRITING

  • What the examiners are looking for?
  • Results checklist.
  • Discussion from conclusion.
  • Recommendation after the project.



Last but not least, he also remember us to do the check list for abstract, problem statement, research question, objective and conclusion that always make student not even take care about this check list because some of the examiners will looks for this to know about the whole project.




VIDEO 




That's all for this week from my updates. I hope you guys can really enjoy your day for today, Thank you, ☺☺☺☺



Sunday, 25 February 2018

Week 5 (FYP 2)



BUYING ADDITIONAL COMPONENTS


This week, I bought additional components to make FYP 2. The project included a female wire jumper, header box, tube solder lead and 23A battery holder.



1. Female wire jumper



2. Header box




3. tube solder lead




4. 23A battery holder.





That's all for today, later I will update for more information about my progress FYP 2 project. Have a nice day you all. Thanks you for reading my blog.

 





Saturday, 17 February 2018

Week 4 (FYP 2)


Write the programming code

This is my programming code for The Development of Gas Leakage Detector for Home Appliance. But this is not already full programming code because I'm not testing yet with node mcu and there is a little bit correction in this programming code. Later I will update if the programming code was successful and does not have a correction. 


int red_led=12;
int green_led=11;
int buzz=13;
int gas_value;
int gas_avalue;
int sensorThres=400;
void setup()
{
pinMode(red_led,OUTPUT);
pinMode(buzz,OUTPUT);
pinMode(green_led,OUTPUT);
pinMode(A1,INPUT);
Serial.begin(9600);
}
void loop()
{
gas_avalue=analogRead(A0);
if (A0 > sensorThres)
{
digitalWrite(red_led, HIGH);
digitalWrite(green_led, LOW);
digitalWrite( buzz, HIGH);
Serial.println(“DANGER!!!!”);
Serial.println(gas_avalue);
}
else
{
digitalWrite(red_led, LOW);
digitalWrite(green_led, HIGH);
digitalWrite( buzz, LOW);
Serial.println(“NO LEAKAGE”);
Serial.println(gas_avalue);
}
delay(100);

}

Saturday, 10 February 2018

Week 3 (FYP 2)


1st FINAL YEAR PROJECT 2 BRIEFING


Today is the 3rd week for this FYP 2. The briefing was conducted in TTL 2 and the attendance to all FYP 2 students is compulsory. The speaker is by Dr. Siti Marwangi Mohamad Maharum and with assistance (staff) to key - in the attendance.  

     

                                    Date: 9/2/2018
                                    Venue: TTL 2
                                    Time: 3pm-5pm


In this briefing, the FYP committees have briefed us about:

  • Code of the Subject FYP must be correct and student should be register the project tittle for minor amendment before week 10.
  • Assessment that need to be cover for FYP 2 which is final report (logbook/blog) , presentation, and project proposal. 
  • FYP 2 should be continues after the proposal report with do the results & analysis , discussion , and conclusion of overall project. 












DESIGN SCHEMATIC DIAGRAM

Today I want to update my blog on the design scheme diagram. I have been researching for schematic diagrams about gas leaks and most design diagrams are the same. Therefore, I will refer to some of their design diagrams to create a simple design diagram so that can make the user comfortable when using it. However, I would refer to the co-supervisor that is Prof. Zulkifli to see whether this design diagram is appropriate or not to use when making gas leakage detectors. 












           

Saturday, 3 February 2018

Week 2 (FYP 2)


DESIGN PROJECT HARDWARE AND SOFTWARE (cont)


This week I have been meet my co-supervisor to discuss about my progress FYP 2 project. We discuss about coding and at the same time he told me to choose that I want to connect massage to the owner with wireless or blue tooth low energy which is either this two is very cheaper and can make the user comfortable to use it. The other information that I can share with you all is this project will detect sound to make every housewife or user alert about gas leakage detector. Before that, my co-supervisor told me to make some research about blue tooth low energy and easy for me to understand so that i can make it later. However, he also told me that this project can make me get the result with two solution which is grafana or MQTT.  MQTT is  (MQ Telemetry Transport or Message Queuing Telemetry Transport) is an ISO standard. 



EXPLANATION OF MQTT


What is MQTT?

MQTT (MQ Telemetry Transport or Message Queuing Telemetry Transport) is an ISO standard (ISO/IEC PRF 20922) publish-subscribe-based messaging protocol. It works on top of the TCP/IP protocol. It is designed for connections with remote locations where a "small code footprint" is required or the network bandwidth is limited. The publish-subscribe messaging pattern requires a message broker. The specification does not specify the meaning of "small code footprint" or the meaning of "limited network bandwidth". Thus, the protocol's availability for use depends on the context. IMQTT-SN  is a variation of the main protocol aimed at embedded devices on non-TCP/IP networks, such as ZigBee.


Why MQTT is used in IoT?

The connected devices need a protocol using which they could communicate only when it is required. Devices with constrained resourcesshould be able to communicate with various other heterogeneous devices. MQTT is described on the mqtt.org siteas a machine - to -machine (M2M) / IoT connectivity protocol. 





Thank you for reading my blog. Later I will update for more progress and have a nice day you alls ☺☺☺☺☺


Saturday, 27 January 2018

Week 1 (FYP 2)



The first week of my FYP 2 project is now begins. So, now I need to continue the progress of my project from FYP 1 that have been left before form last semester. 



Objective:
  • To introduce the FYP 2.
  • To continue the progress from FYP 1.



Conclusion:

The project for "The Development of Gas Leakage Detector for Home Appliance" is now officially start.